LeConte Elementary School was constructed in 1951 and is comprised of two buildings: the main building, a two story reinforced concrete building with a partial basement, and a double-wide portable building.

  September 2004 Conditions Proposed Conditions
Enrollment Approximately 330 students Approximately 350 students
Gross Floor Area 56,100 square feet 56,100 square feet
Site 3.24 Acres 3.24 Acres


Construction Projects

Completed work includes two major modernization projects, a grounds project, carpeting in the classrooms and a few other minor projects. We plan to replace the roof, paint and replace floor coverings.

Completed Work or Work In Progress
Minor Repair Work Fall 1994
Modernization (Phase I) Summer 1994
Grounds Improvement Spring 1995
Classroom Carpeting Summer 1995
Modernization (Phase II) Summer 1999 - Spring 2000
Roof Replacement Summer 2003
   
Future Work  
Paint and Floor Coverings Summer 2010


Budget

Work in Progress or Completed $3,818,108
Future Projects $693,000
Total Budget $4,511,108


Detailed Scope of Work

Completed Work

Projects comopleted to date include:

  • Replacing the breezewa
  • Removal of hazardous materials
  • Painting the entire exterior of the sechool and selective reglazing of windows
  • A new fire alarm system and all new lighting (except the multipurpose rooms)
  • A new boiler, new heating distribution pipes and new unit ventilators
  • A new energy management system
  • Replacement of the main electrical switchgear and subpanels
  • A new intercom and data wiring
  • New clocks and bells
  • New vinyl tile in the classrooms and office areas and new carpeting in the classrooms
  • Interior corridor painting and installation of some window film for seismic safety
  • Radon mitigation work
  • Stage resurfacing, minor cabnetry work, some restroom and roofing work
  • Improvement of the grounds
  • Installing new receptacles and new lights in the multipurpose and basement areas
  • Overhaul of the forced air units in the auditorium and cafeteria
  • Overhaul of the water heaters and modification of the combustion air supply
  • A new concrete slab in the cafeteria including modification to some of the utility lines
  • New floor coverings in the cafeteria and the auditorium
  • Improving the kindergarten yard and the entries
  • Adding a new library space
  • Creating a new main office
  • Replacing the roof
Most of the improvements listed above were designed by Baker/Vilar Architechs or Davis and Joyce Architechs.


Future Work

In the future, we plan to:

  • Replace floor coverings
  • Paint the building