LeConte Elementary School - Facilities

Summary
LeConte Elementary School was constructed in 1951 and is comprised of two buildings: the main building, a two story reinforced concrete building with a partial basement, and a double-wide portable building.
| September 2004 Conditions | Proposed Conditions | |
| Enrollment | Approximately 330 students | Approximately 350 students |
| Gross Floor Area | 56,100 square feet | 56,100 square feet |
| Site | 3.24 Acres | 3.24 Acres |
Construction Projects
Completed work includes two major modernization projects, a grounds project, carpeting in the classrooms and a few other minor projects. We plan to replace the roof, paint and replace floor coverings.
| Completed Work or Work In Progress | |
| Minor Repair Work | Fall 1994 |
| Modernization (Phase I) | Summer 1994 |
| Grounds Improvement | Spring 1995 |
| Classroom Carpeting | Summer 1995 |
| Modernization (Phase II) | Summer 1999 - Spring 2000 |
| Roof Replacement | Summer 2003 |
| Future Work | |
| Paint and Floor Coverings | Summer 2010 |
Budget
| Work in Progress or Completed | $3,818,108 |
| Future Projects | $693,000 |
| Total Budget | $4,511,108 |
Detailed Scope of Work
Completed Work
Projects comopleted to date include:
- Replacing the breezewa
- Removal of hazardous materials
- Painting the entire exterior of the sechool and selective reglazing of windows
- A new fire alarm system and all new lighting (except the multipurpose rooms)
- A new boiler, new heating distribution pipes and new unit ventilators
- A new energy management system
- Replacement of the main electrical switchgear and subpanels
- A new intercom and data wiring
- New clocks and bells
- New vinyl tile in the classrooms and office areas and new carpeting in the classrooms
- Interior corridor painting and installation of some window film for seismic safety
- Radon mitigation work
- Stage resurfacing, minor cabnetry work, some restroom and roofing work
- Improvement of the grounds
- Installing new receptacles and new lights in the multipurpose and basement areas
- Overhaul of the forced air units in the auditorium and cafeteria
- Overhaul of the water heaters and modification of the combustion air supply
- A new concrete slab in the cafeteria including modification to some of the utility lines
- New floor coverings in the cafeteria and the auditorium
- Improving the kindergarten yard and the entries
- Adding a new library space
- Creating a new main office
- Replacing the roof
Future Work
In the future, we plan to:
- Replace floor coverings
- Paint the building